Primary Torsion Polyurethane Belt Cleaner
Delivery term:The date of payment from buyers deliver within days-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Shanxi
-
Validity to:
Long-term effective
-
Last update:
2020-07-28 07:23
-
Browse the number:
329
+
- Contactaixin:
Contactaixin:
sxbmd(Mr.)
- Email: telephone: phone:
-
Area:
Shanxi
Address:0716, Building E, No. 13 Longsheng Str, Comprehensive Reform Zone, Taiyuan, Shanxi, China
-
Website:
http://www.bumtresdconveyor.com/ http://sxbmd.tabingxin.com/
+
The Importance of Primary Belt Cleaners
Our primary torsion polyurethane belt cleaners can keep conveyor systems cleaner, safer and more productive by eliminating carry-back that can cause housekeeping and maintenance issues.
1. Product Details
2. Diagram of Physical Dimensions
Model | Belt Width | Steel Tube Length | Blade Length | |
SXBMD-HN | 65 | 650 | 1600 | 570 |
80 | 800 | 1800 | 760 | |
100 | 1000 | 2000 | 950 | |
120 | 1200 | 2200 | 1140 | |
140 | 1400 | 2400 | 1330 | |
160 | 1600 | 2700 | 1520 | |
180 | 1800 | 3000 | 1710 | |
200 | 2000 | 3200 | 1900 | |
220 | 2200 | 3500 | 2090 | |
*Note: Can be customized according to customers’ specific requirements. |
3. Diagram of Installation Position and Dimensions
4. Instructions Installation and Adjustment Steps
I Adjusting Seat of The Cleaner II Adjusting Seat of The Cleaner ① Permanent Seat ② Tube Sliding Seat ③ Spring Adjustment Lever ④ Pressure Ring ⑤ Screw Set For Permanent Seat (M16X45) ⑥ Screw Set For Tube Sliding Seat (M12X40) ⑦ Screw For Permanent Seat(M16X110) ⑧ Nut (M16) ⑨ Nut (M16) ⑩ Nut (M16) ⑪ Bolt (M12X40) ⑫ Spring Cup |
5. Assembly Sequence
5.1 According to the [Diagram of Installation Position and Dimensions], determine the installation position of ①Permanent Seat in I Adjusting Seat of The Cleaner. Connect it with Conveyor Frame and lock it with the frame with ⑤Screw Set For Permanent Seat (M16X45);
5.2 Pass the tube through the installed ②Tube Sliding Seat and ④Pressure Ring from the other side;
5.3 Set II Adjusting Seat of The Cleaner into the other end of the tube, and lock it with Conveyor Frame;
6. Qualification & Patent Certificates
7. Shipping & Packing & Serving
http://www.bumtresdconveyor.com/